PVF Products
Filters 10,621 Results
$209.09
Subject to factory lead times
$227.36
Subject to factory lead times
$240.25
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$358.62
Subject to factory lead times
$360.97
Subject to factory lead times
$112.10
Subject to factory lead times
$173.45
Subject to factory lead times
$639.89
Subject to factory lead times
$639.89
Subject to factory lead times
$257.83
Subject to factory lead times
$275.41
Subject to factory lead times
$400.81
Subject to factory lead times
$584.81
Subject to factory lead times
$1,089.92
Subject to factory lead times
$2,062.64
Subject to factory lead times
$92.17
Subject to factory lead times
Subject to factory lead times
$2,895.88
Subject to factory lead times
$5,346.63
Subject to factory lead times
Subject to factory lead times
$209.09
Subject to factory lead times
$227.36
Subject to factory lead times
$240.25
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$344.56
Subject to factory lead times
$358.62
Subject to factory lead times
$360.97
Subject to factory lead times
$112.10
Subject to factory lead times
$173.45
Subject to factory lead times
$639.89
Subject to factory lead times
$639.89
Subject to factory lead times
$257.83
Subject to factory lead times
$275.41
Subject to factory lead times
$400.81
Subject to factory lead times
$584.81
Subject to factory lead times
$1,089.92
Subject to factory lead times
$2,062.64
Subject to factory lead times
$92.17
Subject to factory lead times
Subject to factory lead times
$2,895.88
Subject to factory lead times
$5,346.63
Subject to factory lead times
Subject to factory lead times
- Pipe, Valves, and Fittings. The catch-all category for everything that makes up the piping side of a plant: the pipe itself, the valves that isolate and control flow, and the fittings (elbows, tees, reducers, flanges) that connect it all. PVF is the bread and butter of every industrial distributor.
- Carbon steel for general industrial. Stainless 304 and 316 for corrosion resistance and sanitary work. PVC and CPVC for water and mild chemicals. Brass for instrument air and water. Cast iron for low-pressure water service. Exotic alloys (Hastelloy, Inconel, duplex) come up for aggressive chemicals and high temperatures. Material choice is driven by the fluid, temperature, pressure, and code requirements.
- Threaded fittings screw together with tapered (NPT) threads. Cheap, easy, but limited to smaller sizes and lower pressures, with a leak path through the threads. Socket weld fittings have a socket the pipe slides into, then get welded around the outside. Butt weld fittings have beveled ends that match the pipe and get welded together. Welded fittings are stronger and leak-tight but require qualified welders per ASME B31.3 (process piping) or B31.1 (power piping) and proper inspection. Threaded for utility, socket weld for instrument-class piping, butt weld for process piping.

Download Line Card
Download the NISCO Inc. Line Card to view all brands and products NISCO Inc. distributes and/or represents.
About NISCO Inc.
NISCO offers a wide range of pressure gauges & instruments, diaphragm seals, thermometers, valves, and flow control products to the industrial and commercial marketplaces, as well as other resellers like ourselves. We can also provide other value-added services such as gauge repair, NIST traceable calibration, diaphragm seal assembly, and valve automation. NISCO takes pride in providing extensive product knowledge, helpful customer service, and market competitive pricing to help fit whatever need you may have because it is our goal to be regarded by our customers as the best supplier of pressure, temperature, and flow control products.








